Infrastructure
At Tamarindo Beach, residents can enjoy the comforts of home with the availability of fresh water. Presently, there are two operating 10,000 gallon water tank towers (see photo) at the project. Currently, the water line terminates in the middle of our land, at the front gate of phase one. Our construction requirement is to dig up the road, lay pipe and add lot T junctions. One 15,000 gallon drum style tank is installed off island (see photo).
As the weather changes from wet season(mid October) to dry season 2007, we will be upgrading the water system to the individual lots & throughout all our terrain. As per our engineer plans, Tamarindo Beach will be moving forward with installation of a 4" pipe, from the existing 2" pipe and additional water towers.
|